Overview
This job was completed in 90 days and consisted of demolition of an existing parking garage, site preparation including utilities, foundations and concrete slab, and full construction.

“These gentlemen are perhaps some of the most experienced and knowledgeable individuals I have ever had the pleasure of working with.”
Stephanie Goins

Interior
This 14,050 SF, two story building with about 850 SF of office space plus restrooms and a retail shop is used as a museum attraction.

Exterior
The building is constructed with conventional steel. The exterior is all faux stone which was built off site and shipped in. The structure was built to match the exterior perfectly for installation.