After fire destroyed the front part of the original building Joseph Construction was called in to rebuild with a new design.

Overview
We demolished what had been severely damaged and rebuilt with updated front fascia, metal walls and MR-24 roof. We also reroofed the existing structure with Butler Re-roof system and 18 Sunlite daylighting strips.
<

Challenge
The existing building had been built in six different phases, three of which were destroyed by the fire, so we had to work around multiple angles on the roof to tie in new roof and re-roof.